Projects
Our projects set a benchmark in mechanical services,
delivering tailored solutions from concept to completion.
Project Experience
For over 20 years Airpro have been responsible for and completed numerous large scale HVAC projects & mechanical service upgrades. We are regional and remote location experts. Our core strength lies in a dedicated and stable workforce with unparalleled expertise in the HVAC industry.
Over the last decade we have developed a particularly strong reputation in Western Australia’s commercial, industrial, mining and defence sectors based on decency, honesty, integrity and our desire to foster lasting relationships with all individuals and corporations we encounter.
- Project management, supervision and contract administration
- In house mechanical engineering, from concept to completion
- Procure, supply and install mechanical plant and equipment
- Procure, supply and coordinate installation of electrical and instrumentation control
- Procure, supply and coordinate installation of Mechanical Services Switch Boards (MSSB)
- Document control
- Test run and commissioning, to stringent controls and detailed specifications

onslow iron project - kens bore resort
Client: Mineral Resources Limited (MRL)
Project Location: Kens Bore Pilbara
Project Value: $10+ Million
Completion Timeframe: 10 Months
Airpro was awarded this project in 2024 and lead the installation of mechanical services at the Kens Bore Resort as part of the Onslow Iron Project. We provided comprehensive design and engineering, project management, mechanical services, and controls to each of the village central facilities.
Airpro installed mechanical services in the:
- Restaurant
- Tavern
- Airport
- Recreation Centre
- Administration
- Medical Building
- Gymnasium
onslow iron project - kens bore npi laboratory
Client: Mineral Resources Limited (MRL)
Project Location: Kens Bore Pilbara
Project Value: $1+ Million
Completion Timeframe: 4 Months
Airpro’s scope of work included design, engineering, installation and commissioning of comprehensive mechanical services systems in the NPI Laboratory. This included refrigerated package air conditioning, nitrogen, compressed air, P10 gas, chilled water, vacuum and dust extraction and an integrated controls system across designated areas.
A dust and material chip extraction system with complete power integration was installed, along with a compressed air system featuring a 5000L air receiver, refrigerated drier, piping, and control panel for optimised operation. A vacuum system with robust steel piping and ceramic connections was installed and commissioned, with all relevant data submitted.
A fume extraction system was also set up, complete with ductwork and control panel for streamlined functionality.
Finally, Airpro installed, tested, and fully commissioned all electrical systems, including MSSBs, cabling, VSDs, and controllers, ensuring seamless integration and operation across all systems.

mandurah aquatic and recreation centre (MARC)
Client: PCB Contractors
Project Location: Mandurah
Project Value: $1+ Million
This project was a complex undertaking as there were roof damage issues following a storm event. The works were directly over the indoor pool and required us to shut down AHU serving the pool area, remove the very large existing ductwork, then at later stage after roof repairs were made, supply and install new duct, balance air flows and recommission the systems.
FMG IRON BRIDGE
Client: FMG
Project Location: Iron Bridge Minesite
Airpro Mechanical was responsible for the installation of a large Nederman extraction system to Iron Bridge for FMG.
OTHER PROJECTS
WA Defence Bases - RAAF Pearce & HMAS Stirling
Client: Ventia
Project Location: RAAF Pearce, HMAS Stirling, Campbell Barracks
Project Value: Various
Completion Timeframe: Various
Airpro have been responsible for the completion of upgrades to numerous Australian Defence assets. Projects from 5kw to 300kW cooling capacity have covered removing and replacing redundant equipment, procurement of new HVAC-R equipment, (Package units, CRAC units, etc) wiring and control panel cables and final testing and commissioning of new equipment.
Airpro have been responsible for replacing Air-conditioning systems at multiple buildings in HMAS Stirling.
Covalent Lithium - Kwinana Refinery
Client: Decmil
Project Location: Kwinana
Completion Timeframe: 12 Months
Airpro Mechanical was awarded the mechanical services contract for this world class refinery. The refinery will produce enough lithium hydroxide to put approximately one million electric vehicles on the road every year.
BHP Whaleback
Client: BHP
Project Location: Whaleback Mine
Completion Timeframe: 4 Weeks
Airpro were responsible for the installation and upgrade of 160kW of critical HVAC equipment within the immediate area of Whaleback main crusher, whilst it remained operational. This presented a number of challenges that were worked through and a safe and efficient project was completed.
Installation of clean air solutions, air pressurisation systems.
Numerous MCC rooms and facilities
Projects Projects
RTIO West Angelas - Sample LAB Upgrade
Client: Rio Tinto
Project Location: West Angelas Mine
This is a large project with a number of stages, the first being an upgrade to the LAB.
Airpro Mechanical are installing two new packaged outside air dehumidifier units, including outside air filtration units.
Replacement of a number of existing ducted and wall split systems
Projects Projects
FMG Solomon, Christmas Creek, Cloudbreak & Eliwana Minesites
Numerous projects to on all minesites and accommodation areas.
Installation of clean air solutions, air pressurisation systems.
Projects Projects